Video blog: Displaying different projects with different distance scales on one page

See how to create a second Time-distance-diagram, that contains a different project. That method can be used either for showing separate distance areas in one project but also to display different stages of the same project: Displaying the main schedule and a scenario schedule on one page.

Video:


This video ist hosted by youtube. please change to the best resolution availlable in the bottom settings bar.
(Direct link to the video: http://youtu.be/sdE0xfJc6ow)

(2463)

TILOS at South Carolina DOT MEETING

Linear project Americas was a sponsor of the  15th Annual American Council of Engineering Companies of South Carolina/ SC-DOT meeting on October 24 in Columbia, South Carolina. This conference was attended by approximately 80 engineers and planners from the South Carolina Department of Transportation and 200 engineers from major engineering companies. Eddie Reeps, the local TILOS Associate in the South East, and Lorne Duncan ( Managing Director in the Americas) provided demos and answered lots of questions during a very busy day.

Eddie and Lorne at DOT meeting

TILOS was well received by civil engineers and planners working for the state and private companies. Of great interest were some of the new features of TILOS 8 – specifically the mass haul diagram and calculator and the integration of TILOS with Google Earth. To quote one engineer:

“TILOS is the planning tool that we should all be using in the South”.

 

(1366)