Have you ever asked yourself how to display an infrastructure project in a Gantt diagram – in a proper way?

Location based Scheduling is the main target of TILOS – Time Location Scheduling.

See below a Gantt Diagram structured by Location coming along with the correspondent Location Maps – converted from a Time-Location-Diagram.

Click at the sample pictures to enlarge and watch out for TILOS Version 9!

Time Location Diagram

Time Location Diagram of a Sample Infrastructure Project

Arrows

Structured Gantt Diagram with Location Maps of the same Project

Structured Gantt Diagram with Location Maps of the same Project

 

(2398)

Leave a Reply